Sector

Automation

ADENSO designs and commissions industrial automation: PLC programming, SCADA configuration, control architecture, safety system integration and remote monitoring for water treatment plants, manufacturing lines and process facilities that run around the clock.

Your facility runs 24/7 — your automation partner should think that way

Downtime is expensive. Whether you're running a water treatment plant, a manufacturing line, or a processing facility, unreliable control systems cost you money every minute they're not working. Yet many automation projects fail not because of bad hardware, but because of poor system architecture and rushed commissioning.

ADENSO designs and delivers automation solutions built for long-term reliability. From PLC programming and SCADA configuration to full system integration and commissioning, we engineer control architectures tailored to each facility's operational reality — not generic templates.

We also specialize in retrofit and modernization projects, bringing aging control systems up to current standards without requiring a full plant shutdown. Through Aden Group, HA-TEC System in Germany adds robot-guided painting and coating line automation to the capability set.

Frequently asked questions

What automation services does ADENSO offer?

Control system design, PLC and SCADA engineering, industrial IoT integration, safety system integration, remote monitoring, commissioning and testing. Projects are delivered turnkey or as engineering support to the client's own team.

Can ADENSO modernise an existing control system without a plant shutdown?

Yes. Retrofit and modernisation projects are planned in phases so aging controllers, networks and HMIs are replaced during scheduled maintenance windows, keeping production or treatment running.

Which facilities does ADENSO automate?

Water and wastewater treatment plants, manufacturing lines and processing facilities. Water infrastructure clients include regional water authorities such as BUSKİ, İSU and OSKİ.

How does ADENSO approach commissioning?

Factory and site acceptance tests are defined at design stage, executed with the client, and documented. Commissioning is treated as part of engineering, not an afterthought, because rushed commissioning is the main cause of unreliable control systems.

Have an automation project?

DISCUSS YOUR PROJECT